Estimating
Estimates
are required only if jobs are to be analyzed for cost
variances. It is not necessary to estimate or
set up every job prior to running the job. Jobs without
estimates or planned routings may simply have the
time and materials accumulated against them.
Multiple
estimates can be created for each part and those estimates
may then be moved into customer quotes and orders.
When
an estimate is created it uses a method file for that
part. The method contains the routing, purchases,
and materials required to produce one part.
The estimate then uses the method to calculate the
cost to make the required number of parts. After
it calculates the cost it displays a summary of costs
and prints a detailed report.